PRODUCT
home << product
CDH erection of steel hanging lifting clamp (DSQH)

Use: apply to the plate vertical lifting.
Load of:0- eight tons.
Forging a low-carbon quality steel from.
To test for two rated load, lifting operating alone or in the use of two complementary.
Only at the same time being lifted onto a steel block, the ban being lifted onto stack, the process of being lifted onto the collision may not be hanging on.
Lifting, must pull up to enable the Central handle spring tension, unloading at the Rafah Central handle down, relax spring, and plate to clamp separation.
Test 2 times the maximum load for the work load.
Prohibited the use of overloading.

 

Tel:86-312-8151230   E-mail:cq@chuanqiqz.com / zhangxinchen98@163.com     冀ICP备11010150号
Fax:86-312-8152011   Copyright@Qingyuan Chuandao Hoisting Machinery Co.,Ltd.